For making curved cuts you can use tile nippers.
Tile installation process.
Use tile spacers to make sure tiles are square and evenly spaced.
If the tile is too thick for nippers try the following.
Chipboard cushioned vinyl flooring particle boards of any type oriented strand board osb interior grade plywood tongue and groove planking and hardwood floors are unsuitable substrates for direct installation of ceramic tile.
Use spacers to hold tiles in place while they dry image 4.
Cut tile as needed.
Use a level to make sure tiles are straight.
Lay the tile flat and then with mild pressure slide the tile 1 4 inch back against the thin set ridges then slide it back into place.
Make masterful curved cuts with a nipper chipping.
Repeat along other center line if necessary.
You can use a tile cutter to achieve pinpoint straight or diagonal cuts.
These are rounded and depending upon design can either be laid out end to end or in an overlapping style.
After you have completed the fields that is the broad surfaces of the roof you will need to cap the tops with special ridge tiles.
As you near cabinets doorways walls and other flooring stops trim tiles as needed for installation.
This should be the final step in the process of installation.
Next lay out a row of loose tiles along the center lines in both directions leaving spaces for uniform joints use tile spacers.
Next you set the tile with mortar based on your tile type.
First you have to prep the surface ensuring it is clean flat and ready for tile installation.
Position tiles to minimize visibility of tiles that must be cut to size.
Use a tile cutter for small straight cuts.
At the beginning of your tile floor installation always do a test to ensure the consistency of the mortar is appropriate.
Lastly you grout the tile and apply a sealer.
Installing new tile is a multi step process that typically takes 1 3 days depending on the space and size of your project.
Continue the process using the chalk line as a guide and placing spacers between each tile to ensure uniform distance between the tiles.
Use your hands or a grout float to apply pressure.
Once in place push the tiles evenly into the thinset.
Use a tile saw or wet saw both rentable if necessary for cutting numerous or thick tiles.
Stick to the script and facilitate your tile installation with the perfect adhesive application.
Put the first test tile onto the thin set bed.
Installing over wood.
To install ceramic tile over wood the wood surface must be structurally sound enough to support the weight of the tile.
Check the level of each row before you set the next one image 3.
Wipe the tiles with water and a clean sponge as you set them.
Then lay tile in a configuration that will use the most whole tiles and best fits the space.
When all the tile work is complete allow the tiles to dry in place for several days before grouting.
Install the ridge tiles.